Dustin WinslowBonne Terre Recording Connection

chapter 3 Posted on 2015-04-13 by Dustin Winslow

i didn't go to the studio this week due to the weather, we had tornados and I got trapped at work. But this chapter was very very technical and i enjoyed learning more about bit depth and sample rates. I'm excited to go in to the studio tomorrow.

« Return to Dustin Winslow's Blog

More Blog Entries from Dustin Winslow